A place for family, on your own land.

A self-contained home for an ageing parent, an adult child or guests. Made in our factory, installed in 2 to 4 days, with the permits handled for you.

A double-wide pod with a pergola and deck in a suburban backyard
Two sofas in the living space of the Werribee pod, the kitchen behind
Granny flats

Close enough to help. Private enough to feel like home.

A quiet retreat for an ageing parent. A first place for an adult child. A guest house for the family who visit. A pod gives each of them their own front door, a few steps from yours.

Our granny flats and tiny homes run from 6 m to 12 m long, on a 2.4 m width or a 4.8 m double width. A bedroom, a living area and an ensuite bathroom come as standard. Add a kitchenette or a full kitchen, cabinetry, a deck or a pergola.

The permit question, answered plainly.

  • Victoria

    A recent change in the law means a small second dwelling no longer needs a planning permit. It has never been easier to put a pod on your land.

  • Every other state

    For larger pods, we handle the permit process for you.

  • Pods on a trailer

    A pod on a trailer avoids planning and building permits.

  • Built to code

    Every pod is engineered to meet the National Construction Code (NCC) and Australian Standards.

Granny flats and tiny homes.

Families who have already done it.

Click a photograph to see it large.

From first chat to front door in 12 to 14 weeks.

  1. 01

    Initial consultation

    Thirty minutes with your local specialist, via Google Meet.

  2. 02

    Design meeting

    Every wall panel can be swapped for another panel, a window or a door.

  3. 03

    Quoting

    A fixed price, including delivery and installation in metro areas.

  4. 04

    Order agreement

    A 30 percent deposit places the order into production.

  5. 05

    Delivery and installation

    Two to four days on your land.

Permits and approvals.

The smaller Elsewhere pods like the 2.7m and 4m models, usually don't require council permits, and many 6m pods don't either, depending on your state and council. Ask us to check your site before you order. For larger pods, we can handle the permit process for you. Every pod is engineered to meet the National Construction Code (NCC) and Australian Standards, ensuring peace of mind.

Yes. We offer trailer-mounted pods if you want portability or would rather avoid a permanent foundation. A pod on a trailer avoids planning and building permits.

Smaller pods can sit on firm, level ground with pavers, a deck or a concrete slab. For larger models we recommend a concrete base or a screw pile system. If you would rather not have a permanent foundation, a trailer-mounted pod is an option.

Talk it through with a local specialist.

Thirty minutes on Google Meet. Bring your block, your family's plans and your questions.